-

Côte d’ivoire: Installation of EXTICOV-LHD® fire blankets and STORM BARRIER with VEOLIA and ENYS POWER
#International realisation SANERGRID with our partner for Africa and DOM TOM Enys Power. VEOLIA project in #cotedivoire for…
-

Spain : refurbishment of a transformer station with an ERT containement tank
#International #1 #Spain: SANERGRID supports you in your international projects. Example of a medium voltage project with our…
-

UK : delivery and installation of new oil containment system for electrical transformer
#International #2 #Unitedkingdom : SANERGRID and its partner GES Group (Grants Electrical Services Ltd.) deliver to the electrical…
-

Press release KOLEKTOR ETRA – SANERGRID: Record contract with ENEDIS
Extract […] Peter Novak , CEO and Commercial Director of Kolektor Etra, signed the largest contract in the…
-

StormWater Petro-Barrier™ : ultra-high flow SPI system for rainwater filtration
FOCUS PRODUCT : Since more than 20 years, the StormWater Petro-Barrier™ is a hydrocarbon separator specially designed to…
-

SANERGRID realization: installation of an LHD fireproof cover at EDF
Installation of a custom-made EXTICOV LHD® fire blanket on an EDF retention pit. These materials are to be…
-

Installation of a SANERGRID retention tank on an EDF site
Supply and installation of a flexible storage tank TRFLEX ECO+ SANERGRID for EDF power transformer. The tank is…
-

SPI Group certified ISO 9001 for its US production site
Our partner SPI, the world’s leading manufacturer of rainwater filtration solutions, has obtained ISO 9001 certification for its…
-

New SANERGRID® achievement: delivery of 2 GRAVITYline SGB 630 kVA dry-type transformers
SANERGRID® has just delivered two GRAVITYline SGB transformers to the city of Lyon. This range has been specially…
-

Delivery and installation of a new 225 kV transformer
Delivery and installation of a new 225 kV Kolektor ETRA transformer at the Chastang dam for EDF CIH.…
